Step by step
Stage 1 : Grid work
To install a suspended flush plaster ceiling we firstly fit a shadowline plaster trim to the perimeter of the room with a drop down from a slab or trusses as specified by the client or designer
Next we fit our hangers onto the slab or trusses to support our main frame work
Galvanized main tees are fitted to our hangers and galvanized cross tees are fitted between the main tees to form a steel grid
From our main frame work we then dropped down further to proceed to build the frame work for our main feature
stage 2 : Boarding and skimming
Plaster boards are screwed onto our frame work and all joint are covered with a fibre jointing tape
Once the entire top level ceiling and the designed feature is boarded we then proceed to do a full skim of the entire ceiling
Stage 3 Painting and electrical
Once completed holes are cut out for the lighting and the entire ceiling is painted
Stage 4
All lights fitted to top level ceiling and the ceiling feature
The concealed lighting fitted to the ceiling feature
Job done